Project Natick

A research project to determine the feasibility of subsea datacenters powered by offshore renewable energy.

Facts and figures

Datacenter designation

Northern Isles (SSDC-002).

Pressure vessel dimensions

12.2 m long and 2.8 m in diameter; about the size of a 40-foot ISO shipping container.

Subsea docking structure dimensions

14.3 m long and 12.7 m wide.

Electrical power source

100% locally produced renewable electricity from on-shore wind and solar, and off-shore tide and wave.

Electrical power consumption

240 kW.

Payload

12 racks containing 864 standard Microsoft datacenter servers with FPGA acceleration and 27.6 petabytes of disk.

Location

European Marine Energy Centre, Scotland, UK.

Internal operating environment

One atmosphere of dry nitrogen.

Time to deploy

Less than 90 days from factory to operation.

Planned maintenance-free operation

Up to five years.